Platform Engineering & Internal Developer Platform
Assesses the internal platform as a product in 7 categories with 33 questions — from golden paths and self-service to adoption, metrics and AI enablement.
7 · Assessment areas
Assessment areas
Each area is evaluated with structured criteria and automated scoring.
Platform as a product
Product ownership, roadmap, user research and service model of the internal platform.
5 questionsGolden paths & self-service
Standardised, maintained paths from code to production, ticket-free and with built-in guardrails.
5 questionsAdoption & voluntary use
Measurable platform usage, driven by value rather than mandate.
4 questionsPlatform metrics
Platform impact on delivery performance, satisfaction, cost and usage.
5 questionsTeam structure & interaction
Platform team design, interaction modes and relief for stream-aligned teams (Team Topologies).
5 questionsAI enablement through the platform
Approved AI tools, internal context, guardrails for agents and cost control as platform services.
5 questionsPlatform operations & reliability
Reliability targets, incident handling and safe change process of the platform itself.
4 questionsCurrency
Review date & sources
- Reviewed
- 2026-10-26
- Version
- 1.0
- Framework
- Platform as a product · Team Topologies, 2nd edition (2025) · DORA AI Capabilities Model (2025)
Primary sources
- DORA — 2025 State of AI-assisted Software Development (v2025.2)
- DORA — AI Capabilities Model
- DORA — Software delivery performance metrics
- Team Topologies — Groupings
- Team Topologies — Second Edition
- OWASP GenAI Security Project — Top 10 for Agentic Applications for 2026
- DORA Insights — Finding balance in the era of tokenmaxxing
Content is checked against the primary sources; every change gets a new version and a new review date.
Ready to assess your IT delivery?
Start with this template for free, get AI-powered recommendations, and export professional reports.
FAQ
Frequently asked questions
This template includes Platform as a product with roadmap and user research, Golden paths, self-service and policy as code, Adoption, satisfaction, cost and DORA comparison, Team design following Team Topologies (platform grouping), AI enablement with guardrails and cost limits. It covers 7 assessment areas and provides AI-powered recommendations.
Most assessments take 15–30 minutes to complete. You can save your progress and continue anytime.
Yes. All templates support PDF export with custom branding. Excel and Word export are included in the Professional plan.