Go-live checklist: go/no-go with knock-out criteria and sign-off
Go/no-go before acceptance or service transition based on evidence: criteria in 7 areas with knock-out rule, score, conditions with due date, frozen gate runs and documented sign-off.
2 · Building blocks
What the tool covers
Every building block works on the same data – key figures, warnings and exports included.
Criteria
functional to security, 7 areas
7 functionsGate runs & sign-off
pre-check, final gate, decision
3 functionsReady for the next delivery step?
Start with sample data, enter your own data and share results as PDF or Excel.
FAQ
Frequently asked questions
The templates cover 7 areas: functional acceptance, non-functional requirements, operational readiness, documentation, training, support handover, and security and data protection. You can add criteria, weight them and mark them as knock-out.
By fixed rules: an open or unmet knock-out criterion means no-go. If all knock-out criteria are met, open items with a condition lead to “go with conditions”. If the sign-off deviates from the recommendation, the tool requires a rationale.
Yes. Gate runs and the decision export to PDF and Excel. Sample data is included for a first look; a gate run is frozen when closed and stays comparable.
The go-live gate is part of the Professional plan: €29 per month or €249.90 per year, with a 14-day free trial on your first subscription. Cancel in your account.